Specifications include, but are not limited to: Mobilization shall include, but not limited to, the performance of preparatory construction operations, including the movement of personnel and equipment to the project site, fee payment, and acquisition for all necessary permits, establishing of temporary facilities necessary to begin work, the cost of required insurances and bonds. Demobilization shall include the removal of mobilized facilities and contract close out procedures. Cut-out and remove up to 1,800 LF of double tee to tee joint sealant on the top level of the garage, prepare the substrate and seal utilizing a two-component urethane sealant in concrete gray color. This work shall consist of removal and disposal of existing joint sealer, abrasive blast cleaning the concrete joint interfaces, furnishing and installing primer, backer rod, bond breaker tape, new Sikaflex-2c NS, TG elastomeric polyurethane sealant and curing. Prime all substrates as required based upon the recommendations of the manufacturer of the specified product, when field testing indicates need, and when the joints will be subject to immersion after cure, as approved by the Engineer.