Specifications include, but are not limited to: 1. Replacement of windows with new, energy efficient models. 2. Replacement of external doors. 3. Addition of framing and insulation for internal cinder block walls. 4. Other work listed in “Scope of Work” section of this document. All work proposed by bidder shall be inclusive of any and all actions to upgrade or repair the proposed line item to include electrical work, plumbing, HVAC or any other task to complete each item. Estimates for this project will also include the removal of any and all debris derived from the aforementioned tasks and handing over the completed project in a clean and ready-to-use condition. The project will be funded in large part by Maryland Program Open Space (POS), Department of Natural Resources. Regulations and policies of POS will apply to this project. 1. Main Hall: a) Include mobilization costs as part of Main Hall line item. b) Stud out walls from ceiling to floor using standard 2”x 4” studs and insulate using R-13 BATT insulation (to include finishing work between walls, floors and ceiling). c) Install 5/8” drywall (to include any taping, painting and finishing work) d) Install 32”painter’s grade wainscoting and chair rail and paint using color and finish chosen by the Town. e) Replace all crown molding. f) Remove and reinstall all side track lights along the perimeter of the room. g) Address any affected electrical outlets, light switches or any other wall mounted fixtures to be flush and finished with newly created wall. Ensure outlets are sufficient for county electrical code. h) Insulate ceiling with R-42 fiberglass (to include finishing work between walls and ceiling) i) Prime and paint walls using color and finish chosen by the Town j) Completed item to include all finishing materials to deliver in a ready-to-use state to include necessary, drywall tape, spackling, caulking, millwork, agreed upon paint, etc... 2. Foyer: a) Stud out walls from ceiling to floor using standard 2”x 4” studs and insulate using R-13 BATT insulation (to include finishing work between walls, floors and ceiling). a) Install 5/8” drywall (to include any taping, painting and finishing work) b) Prime and paint walls using color and finish chosen by the Town c) Install 32” painter’s grade wainscoting and chair rail and paint using color and finish chosen by the Town. d) Address any affected electrical outlets, light switches or any other wall mounted fixtures to be flush and finished with newly created wall. Ensure outlets are sufficient for county electrical code. e) Completed item to include all finishing materials to deliver in a ready-to-use state to include necessary, drywall tape, spackling, caulking, millwork, agreed upon paint, etc.