Specifications include, but are not limited to: 1001 Site Reconnaissance HR 200 1002 Mobilization and Demobilization of ATV Drill Rig EACH 20 1003 Mobilization and Demobilization of Skid Rig EACH 2 1004 Mobilization and Demobilization of Truck Mounted Drill Rig EACH 3 1005 Delay Time/Standby Time, Per Drill Rig and Crew HR 10 1006 Flagger HR 100 2001 Standard Penetration Borings, ATV Drilling (0-50') LF 1,500 2002 Standard Penetration Borings, ATV Drilling (50-100') LF 300 2003 Standard Penetration Borings, ATV Drilling (>100') LF 50 2004 Standard Penetration Borings, Skid Rig Drilling (0-50') LF 300 2005 Standard Penetration Borings, Skid Rig Drilling (50-100') LF 50 2006 Standard Penetration Borings, Skid Rig Drilling (>100') LF 20 2007 Standard Penetration Borings, Truck Rig Drilling (0-50') LF 1,500 2008 Standard Penetration Borings, Truck Rig Drilling (50-100') LF 300 2009 Standard Penetration Borings, Truck Rig Drilling (>100') LF 50 2010 Core Borings Size NXM and/or NXWL LF 300 2011 In-Situ Soil Permeability Tests HR 25 2012 Auger Borings (6" Diameter) LF 500