Specifications include, but are not limited to: The Hazard Mitigation Grant Program, Structure Elevation in Tall Timbers, MD to elevate one residential structure in Tall Timbers, MD above the base flood elevation per the documents contained in this Solicitation. The Work consists of elevating the existing structure to a height of at least three (3) feet above the BFE (approximately 6 ft.) as measured from the existing finished floor elevation and then lowering it onto the new CMU foundation/piers to be constructed by others. The Contractor shall furnish all plant equipment, tools, materials, labor and incidentals necessary to complete the project within the time period specified, and in accordance with the Solicitation documents.