Specifications include, but are not limited to: The scope of work for this project is to replace the septic piping and components including two sets of pump rail supports in the pump station and valve vault. The work also includes replacement of all the piping, components, hangers, and brackets in the pump station, valve vault and the interconnecting piping between the pump station and valve vault. All replacement piping is to be PVC schedule 80 and all valves to be steel. All replacement brackets, hangers, and fasteners are to be stainless steel. There are two add alternates for this project: Alternate 1-Replace the two existing submersible sewer pumps and motors if needed. Alternate 2.-Replace existing pump station platform.