Specifications include, but are not limited to: THE SCOPE OF WORK IS TO INCLUDE, but is not limited to, the following items: 1. Contractor shall provide all required submittals to the Architect within thirty (30) days after issuance of “Notice of Award”/”Notice to Proceed”, or sooner if necessary to avoid delay of work. 2. Contractor shall be required to conduct his activities in a safe manner and shall be responsible for observing the safety regulations of MOSH, OSHA, and local life safety agencies. Contractor to provide all OSHA specified protection required, including fall protection. 3. Contractor shall maintain at all times sufficient manpower levels to meet scheduling requirements and avoid delay to completion of work. 4. Contractor shall provide as-built drawings and warranty of all work under this Contract. Provide copies of Operation and Maintenance Manuals in the format and quantity indicated in the documents. Provide instruction of Owner's personnel on maintenance of equipment and material installed by this Contract. 5. Contractor must be on site to receive and unload construction material deliveries. WCPS staff is not responsible for receiving any deliveries for this construction project. Contractor is responsible for own lifting and hoisting. 6. Contractor shall protect all existing finishes when receiving deliveries and removing trash through areas of the facility outside the limits of disturbance. Contractor shall protect all finished areas of work adjacent to area of new work as construction progresses within the project limits. 7. Provide dumpsters or trucking required to clean and remove daily from site all excess material and debris connected with this work. Should the Contractor’s cleanup be unsatisfactory, the Owner shall perform the work at the Contractor’s expense. If dumpsters are utilized, the Contractor shall coordinate with the Owner to identify a mutually agreeable location prior to commencement of work. The Contractor is responsible for preventing damage to property, such as by setting the dumpsters on plywood in paved areas, and is responsible for repairing any damage occurring as result of the dumpsters. 8. The Contractor is responsible for controlling the containment of dust and debris for the full duration of the project. The Contractor shall provide 100 linear feet of 9’-4” high wood framed dust partitions to control dust between the construction zone and the occupied areas of the school. 9. The Owner will clear furniture surfaces and remove loose furniture in the project area prior to demolition. The Contractor shall protect bulk furniture and built-ins within and adjacent to the project area by covering them with plastic sheets throughout demolition and construction. Once renovations are complete, the Contractor is responsible for removing the plastic sheets and thoroughly vacuuming and cleaning the entire project area. 10. Contractor shall provide final cleaning of all new and existing surfaces within the project limits. Include cleaning all glazing. Including wet mop of floor tile only; the Owner will wax the floors. Prior to final cleaning, Contractor shall remove all miscellaneous labels, stickers, and shipping protection from all hardware and other finish products. Do NOT remove any fire rating labels. 11. Prior to the installation of new flooring, the Contractor is responsible for properly preparing the existing concrete floor substrate and for applying leveling and patching compounds for a smooth and level floor finish.