Specifications include, but are not limited to: Remove & properly dispose of existing roofing materials, flashing, roof vent pipes, exhaust vents, app 700 sf. Remove app 250 sf existing metal roofing panels to include associated flashing and drip edge. Inspect deck/nailers/roof joists, any unsound conditions shall be replaced. Sweep roof deck to prepare for roofing project. Check slope and,make repairs as necessary to assure proper drainage. Install aluminum/metal drip edge to roof perimeters. Install new metal flashing to replace all removed flashing to include chimney areas. Install pipe boots for all pipe and exhaust vents and prepare/install flashing/transition for all vents. Install app 700 sf new Polyurethane Foam, new Acryshield Base Coast, new Acryshield top coat, new roofing Granules/Roof Guard Cementitious Coating. Install app 250 sf of new pre-finished metal roof panels, secure panels to nailer with approved pre-finished screw fasteners. Clean up job site.