Specifications include, but are not limited to: 1 All work will be performed in the Daily A garage on the following doors SO82, SO72, SO62, SO22, NO22, NO12 2 Contractor is responsible to provide all material for the doors listed above per MAA/BMX specifications listed below in line 9 3 Contractor is responsible to provide all labor and tools to complete job 4 Contractor is responsible for all parking fees at own expense 5 Contractor is responsible for removing all trash and debris at own expense 6 Contractor is responsible for his own storage of material and tools 7 Contractor is responsible for following all BWI Safety and Security regulations 8 Contractor is responsible for any repairs to any damage that may accrue at contractors’ own expense 9 the following is to be used on all listed doors above: A 16-gage door (galvinite) B 16 -gage welded frame C Frame dimples to be off set from original D Continuous Hinges will be Select SL 11-HD x Dr. Ht. Clear.