Specifications include, but are not limited to: The Contractor shall furnish all labor, materials, supervision, management, tools and equipment necessary to provide the Scope of Work. The project is located within the (2) fenced-in weight pits, at the East and the West yards, each weight pit is approximately 1600 sq ft totaling approximately 3200 sq ft; refer to the drawings for the location of the scope of work. Scope of Work for each yard, includes but is not limited to: • Remove (+/-1600 sq ft) existing rubber mulch flooring inside the weight pit fencing. • Excavate (+/-1600 sq ft) 6.5” deep of existing soil inside each weight pit fencing to facilitate installation of the MaxPlay Pour-in-Place Safety Surface (4” stone base; 2.5” heavy duty surface, totaling 6.5”). • Legally dispose of all existing rubber mulch, debris and soil off site. • Prepare the soil at the removed areas inside the fencing to the compaction of 95%. The existing slope should be maintained. Refer to reference drawing C-6 • Excavate soil for installation of new trench drain. Basis of Design: Zurn Z874-18 Pre-sloped. Excavation must include a minimum of 4” concrete encasement on both sides and underneath surrounding the trench drain. Install as per the manufacturer’s installation instructions.