Specifications include, but are not limited to: Generally, construction shall consist of installation of a new entrance road, including improvements to create a deceleration lane and increased shoulder width on the south side of the proposed entrance road. Removal and relocation of existing culvert pipes along with road repair per SHA requirements including grading changes along Sharpsburg Pike. Base asphalt layer shall be installed for roadways and parking lots under this contract. Final top coat (surface) will be provided under separate contract except for work immediately adjacent to Sharpsburg Pike which shall have the final top coat (surface) installed under this contract. Concrete curb and gutter shall be provided as indicated on the civil plans except for curb and gutter located directly adjacent to the proposed building.