Specifications include, but are not limited to: 1) Attend post-award meeting and site visit with C-SMMPO representatives after receipt of notice to proceed. Conduct a thorough site investigation of the site location along MD-235/Three Notch Road to determine existing conditions. An analysis of existing conditions shall address four (4) key transportation issues: Roadway operations; Parking occupancy; Pedestrian environment; and Including Gate entrances. 2) Prepare for one(1) public meeting at start of project to receive community feedback including but not limited to using comment cards, sign in sheets, etc. 3) Conduct transportation survey results from the public meeting feedback. 4) The post-award meeting and subsequent meetings with staff are separate and not part of the public meeting requirements.