Specifications include, but are not limited to: 1) Constructing planting beds: a. Rototill, fertilize and amend soil within beds in preparation for plant installation. b. Install trees, shrubs, perennials, annuals or bulbs within planting beds. c. Edge and apply shredded hardwood bark mulch over planting beds. d. Installing pervious stone mulch, e.g. non compacted River Jack stone or noncompacted washed aggregate in lieu of shredded hardwood bark. 2) Planting individual trees, shrubs, perennials, and bulbs: a. Auger drill or hand dig planting pits, or drill pilot holes for live stakes and bulbs. b. Mix fertilizer and soil amendments into backfill soil of planting pits. c. Apply shredded hardwood bark mulch over planting pits. 3) Tree felling and stump grinding of trees or shrubs up to 24 in. depth in open turfgrass areas, individual planting pits, or planting beds.