Loading...
Skip to main content
< Back to results

MDF Room Air Conditioner Unit Installation


Location
Maryland
Publication Date
01/04/2019 01:07 PM EST
Closing Date
01/17/2019 02:00 PM EST
Issuing Organization
Saint Mary's County Public Schools
Solicitation Number
Description

Specifications include, but are not limited to: Contractor will install a new three (3) ton Ductless Split System (base of design M-Series MSY-D36NA-8 & MUY-D36NA-1) to service room A-24 MDF room. This will include at a minimum: othe outdoor unit shall sit on an equipment pad located on the roof oline set between outside and indoor section will be ran reusing the existing roof penetration oinstall new wall mount air conditioning system oelectrical and condensate drainage to the available access point electrical will be ran and connected to Panel LME2 located in room A-60 208 Volts, 1 phase condensate will be tied into the existing (see Drawing 02) oother tasks and materials germane to the installation.

Source
https://emaryland.buyspeed.com/bso/external/bidDetail.sdo?bidId=MDSPS31042409&parentUrl=activeBids (opens in a new window)

Get instant access

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Group

Matching bid notifications from participating agencies

Basic

Access participating agency bids