Specifications include, but are not limited to: 2.2.1 Contractor must provide enough installation/services hours to assist JIS in the installation and configuration of the system. 2.2.2 Contractor must replace the current encoder prior to its End of Life (June 2019) with the current Elemental Live model that provides the same or greater capabilities. 2.2.3 Contractor must replace the current video focus display with Atomos SUMO19M or equivalent display and provide overview of functions to system users. 2.2.4 The Contractor must install a new UPS/Battery backup system in or next to the existing AV rack. Unit must provide enough power resources for users to accommodate short (5 min or less) power interruptions and for safe ending of stream in the event of a power outage. 2.2.5 Contractor will provide brief procedure to follow in event of power outage, if needed.