Specifications include, but are not limited to: Remove & replace light fixtures (10) and Smoke alarms (2). Add an additional (2) Smoke alarms and additional (1) bathroom light fixture. Add or replace missing ceilings joists as per Unit Price # 1. Install new R-42 spray foam insulation throughout entire second floor interior roof area in between the ceiling joists. Install new sheetrock ceilings and removed wall areas, approximately 1500 SF. Remove and replace damaged 1 in plywood floor as per Unit Price 3. Clean and prepare sub-floor. Add luaun board. Install new carpet with pad, approximately 660 SF according to the manufacturers instructions. Repoint approximately 50 SF of interior brick wall. Remove one shower bath unit and associated sheetrock. Install new bath shower unit with concrete backer board and new sheetrock. Properly prepare all wall, ceiling, closets and bottom trim area for new paint. Apply one prime coat and two finished coats of paint, approximately 3300 SF. Painting shall include an additional 350 SF where wall continually transitions to first floor in Common Room 1 and Hallway 1. Clean up site.