Specifications include, but are not limited to: Construction of a 2,000,000 million-gallon elevated composite water storage tank and one (1) 700 GPM double cased water supply well. Additional work includes construction of a new well house, with pump controls, disinfection equipment, metering equipment, and telemetry equipment, to be located within the water tower supporting column, and supply of a diesel generator for standby power. Construction of a new 700 GPM well shall be into the Patapsco Aquifer. Integration of the new 700 GPM well into the water station telemetry and control system is included. Upon acceptance of the new water tower, water supply well and water station, and relocation of cellular telephone service currently installed on the existing water tower (by others), demolition of the existing water tower is included under this Contract.