Specifications include, but are not limited to: 1. Provide new air handling units, ducted thru the wall self-contained Heat Pump system by Bard, miscellaneous heating equipment and all associated equipment to support the replacement of the existing HVAC systems. 2. Upgrade the existing electrical service and provide power to the new HVAC units. 3. Equipment from Bard Manufacturing was used as the basis of design for this project. The Contractor shall be responsible for any changes and all costs to provide a system compliant with the drawings and specifications from the other approved manufacturers listed in the mechanical specifications. This includes but is not limited to construction costs, engineering drawings, permit resubmissions, structural calculations, etc.