Specifications include, but are not limited to: The AACPS is contracting for all labor, supervision, materials, and equipment, necessary to provide grass mowing, trimming, and maintenance of storm water management areas, in accordance with the attached terms, specifications and general conditions. Acreage for grass cutting is estimated and contractors are strongly encouraged to visit each site and field verify existing conditions, as site conditions vary. Please note, acreage stated in specifications includes school building and wooded areas and may not represent all areas to be cut. Drawings may not accurately reflect current configuration of building, driveways, athletic fields, etc., due to recent construction. Portable classrooms exist at various school sites and shall be considered part of this contract. Quantity of portable classrooms may change during the life of the contract but shall not affect the contract price.