Specifications include, but are not limited to: The A/B Connector and BHS Replacement Project will provide a direct, secure connection between Concourses A and B, add significant passenger amenities with expanded concession opportunities, new restrooms, and essentially double the capacity of the current baggage screening system. The initial concepts for the program include approximately 55,000 sf of additional lower level space dedicated to baggage and ramp operations and 45,000 sf of additional departure level space consisting of holdrooms, concessions, and circulation area. Associated projects may include modifications to the central utility plant, providing temporary airline operations space, relocating utilities out of the footprint of construction, and other potential enabling tasks. Specific project goals of the A/B Connector and BHS Replacement Project include: 1. Provide a new in-line baggage screening and handling system with approximately eight EDS machines meeting the latest TSA design requirements to replace the existing baggage screening system. The existing BHS must maintain the existing bag screening capacity throughout construction. 2. Provide modifications to the existing baggage handling system and ticket counter area to expand the overall capacity to allow the tenant airline to consolidate operations in the A/B portion of the Terminal. 3. Relocate five holdrooms to the expanded portion the building and create a direct connection for passenger flow between Concourses A and B. 4. Create new concession opportunities along the new connection as an expansion of the existing concession hall located on the ticketing level between the existing A and B passenger security checkpoints. 5. Add multiple new restroom facilities to improve the level of service to the passengers. 6. Repurpose the existing baggage screening area to improve concession storage opportunities and add freight elevators to simplify materials delivery and trash disposal from the expanded concession area.