Specifications include, but are not limited to: Furnish labor, materials, and equipment required to completely install each system indicated and specified in the plans. Provide demolition as shown in drawings. Furnish and install new cooling tower, variable frequency drive, condenser, water piping, valves, insulation, aluminum exterior pipe jacket, heat trace and accessories, etc. Furnish and install all control components, accessories, labor, etc. as indicated on the drawings. Electrical: Including, but not limited to (see drawings)… Demolition as shown in drawings. Furnishing and installation of CAT-6 cable for the control system from chiller control panel to control computer. Furnishing and installing of power wiring for electrically operated equipment set under this or other contracts.