Specifications include, but are not limited to: A. The Contractor shall: 1) Attend meeting and park site visit with C-SMMPO representatives after receipt of notice to proceed. 2) Conduct a thorough site investigation of the property to determine existing conditions. 3) Provide site analysis opportunities and constraints to include site topography, existing trees (tree survey), street frontage, and community connections. 4) Define permissible and non-permitted uses; 5) Provide for public consultation process to include preparation and presentation for two (2) public meetings before the project begins and after the project is finalized. 6) Prepare a corresponding written narrative (executive summary, body, and conclusion) document. Identify key findings and vision statement, design objectives, design philosophy, park elements and recommended treatments, sustainability and carbon footprint, mobility and accessibility, and civil engineering summary. B. Data Reporting At regular intervals, as agreed upon in the approved project timeline, the Consultant shall update the C-SMMPO representative on its findings. The Consultant shall provide copies of the draft data to the C-SMMPO representative for review. Milestones are completed for forty percent (40%), sixty percent (60%), ninety percent (90%), and one hundred percent (100%) completion.