Specifications include, but are not limited to: . The project consists of removing asbestos containing material located in portions of the 1st floor and stair landings of the Old Classroom Building. a. The Work shall include the removal of thermal system insulation, asbestos floor tile and mastic, and cove base throughout the identified areas as shown on the drawings in order to remove asbestos from a portion of the building as proposed. 2. The Asbestos Removal work includes: Quantities of materials to be removed, which are provided herein, are approximate estimates by the Project Designer. It shall be the responsibility of the CONTRACTOR to verify and agree with quantities provided prior to submitting a bid. If the CONTRACTOR bids for this work without disputing specified quantities of described materials, this shall indicate acceptance of a Scope of Work, which includes removal of all described materials, regardless of listed quantity. The Incidental Work includes: A. Suspended ceiling tile system shall be removed in order to access pipe and pipe fitting insulation above. Contractor shall dispose of suspended ceiling system as construction debris. All light fixture or other ceiling mounted items shall remain in place. Support fixtures or other ceiling mounted items using wire or other approved methods. Return all escutcheon rings to the Owner. 4. Replacement work includes re-insulation of the thermal system insulation removed as part of this project or bare piping located in the area identified for thermal system insulation removal. No replacement of floor tile or cove base is required as part of this project. No replacement of the suspended ceiling system required to gain access to the thermal system insulation is required as part of this project. Re-insulation of the thermal system insulation shall be completed in accordance with Section 15250- Insulation.