Specifications include, but are not limited to: The Contractor shall furnish all labor, materials, supervision, management, tools and equipment necessary to provide the Work. The work is on the third floor holding cell area of the hospital building in the facility; refer to drawings for the area of work. Scope of Work includes but is not limited to: • Remove ten (10) existing sliding doors with bar grills. • Salvage locks, hangers and bottom guides from existing doors. • Properly dispose of the existing doors off site. • Install ten (10) new 12 gauge detention hollow metal doors. The new door shall be ASTM 1450 Grade 1 and prime painted finish. • The new door shall be half lite doors with MPC500 glazing by Global Security Glazing or approved equal. Stiles at sides of lite and top of door to be 4”. • Install salvaged Folger Adam 32D locks with new cover plate provided by the door manufacturer or lock manufacturer on the new doors. • Install salvaged hangers and guides on the new doors. Hanger will need to be shimmed to keep the new door in the center of the existing door receiver channel. • Provide a hinged cuff port as large and high on the new doors as the door manufacturer will allow. The hinges shall be surface mounted Southern Folger 203FP or equal. • Provide a National 832 Extra Heavy Duty Pad-Lockable Barrel Bolt at each cuff port. Barrel Bolt to be mechanically attached to the door face with security screws. Padlocks will be provided by the Owner. • Provide raised door pull on the outside of the new doors. Door pull shall be Southern Folger 212C or equal. • Adjust doors for proper function and fit. • Touch up all exposed steel with universal primer.