Specifications include, but are not limited to: A. WEEKLY MOWING (28 cycles) All weekly mowing sites (28 cycles) need to be mowed every 5-7 days (frequency will depend upon growing season). The mowing height shall be a minimum of 2.5 inches and a maximum of 3 inches. Areas around buildings, fences, parking lots, signs, trees, etc. are to be hand trimmed with a weed eater. Contractors must keep walkways, gravel areas, curbs, gutters and roadways free from all vegetation. Accumulated grass clippings must be removed prior to leaving the site. Contractor is responsible for picking up all trash located in the site area of mowing. Mowing overtrash isprohibited. B. BI-WEEKLY MOWING (14 Cycles) All bi-weekly mowing sites (14 cycles) need to be mowed every 2 weeks (frequency will depend upon growing season). The mowing height shall be a minimum of 2.5 inches and a maximum of 3 inches. All movable items are to be mowed under. Areas around buildings, fences, parking lots, signs, trees, etc. are to be hand trimmed with a weed eater. Contractors must keep walkways, gravel areas, curbs, mulched traffic islands, gutters and roadways free from all vegetation. All grass clippings must be removed prior to leaving the site.