Specifications include, but are not limited to: This project entails the maintenance of traffic; erosion sediment control; demolition and removal of existing concrete alley mat; demolition and removal of curb, sidewalk or storm drain structures; excavation and backfill; hauling and stockpiling of materials; saw cutting and removing bituminous concrete; placement of 4,500 PSI reinforced concrete alley mat and aggregate base; HMA bituminous concrete; placement of 3,500 PSI concrete sidewalk and handicap ramps; storm drain structures; reinforced concrete wall; monolithic concrete alley mat with curb; topsoil and turf establishment and other related items necessary to complete the project in accordance with the plans and specifications prepared by the City of Hagerstown.