Specifications include, but are not limited to: perform the Work including construction quality control including inspection, testing and documentation. ; 1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances. 2. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits. 3. Remove tools, construction equipment, machinery, and surplus material from Project site. 4. Remove snow and ice to provide safe access to building. 1. Portland Cement and Portland Pozzolan Cement 701.01 2. Water 701.02 3. Air Entraining Chemical Admixtures 701.03 4. Water Reducing Chemical Admixtures 701.04 5. High Range, Water Reducing, Chemical Admixture 701.0401 6. Set Retarding Chemical Admixtures 701.05 7. Curing Materials 701.06 8. Water Stops 701.07 9. Smoothed Surface Asphalt Roll Roofing (Formerly 701.08 Heavy Roofing Felt). 10. Fly Ash