Specifications include, but are not limited to: a. As work arises, the MaineDOT will assign work to the Contractor. This work is to include, but not limited, to general electrical maintenance and repairs in our garages, office buildings, crew quarters, out buildings within MaineDOT Region 1 area, this may also include the installation of temporary services at various bridge repair locations that require setting a light pole, aerial or lateral install of single and three (3) phase drops in Region 1. b. Assignments will be performed by one electrician and a service truck unless otherwise directed by the Department. If the Contractor determines that additional electricians or equipment are needed, the Contractor must get prior Department approval for the additional workers or equipment to be measured for payment. c. Assigned work will be performed at the bid rates as stated in the “Schedule of Items”. Any item not contained in this “Schedule of Items” will be decided and agreed upon between the MaineDOT and the Contractor. The Contractor will receive the Actual Cost of Materials including freight and Delivery charges (but excluding any sale or use tax) plus a single 15 percent markup. MaineDOT will determine which materials will be purchased by the Contractor and which will be purchased by MaineDOT. d. Contractor will begin billing their time from the time they arrive on a specific job site until the Contractor has left the job site for each Work Assignment. All Travel time including traveling to and from the job site and picking up any parts and materials will be considered incidental and shall not be measured for payment.