Specifications include, but are not limited to: This work shall consist of furnishing and operating equipment when needed by the MaineDOT. The Department and each responsive, responsible bidder who meets the requirements and specifications of this proposal may enter into a Contract to provide dump trucks with experienced operators to perform construction and maintenance work on an as needed basis. The Contractor with the lowest rate for the equipment in the equipment category with the appropriate attachments and capabilities will have first option to furnish the equipment. Not all dump trucks will be hired under these contracts. Dump trucks hauling materials for the on call paving contracts may be hired under the on call paving contracts. Equipment. The equipment specifications and terms are as follows: x Valid inspection sticker good thru the term of rental x Provide daily fuel, oil and grease x Provide registration x Provide insurance Dump Trucks – > 7 CY but < 10 CY Dump Trucks – > 10 CY but < 12 CY Dump Trucks – > 12 CY but < 14 CY Dump Trucks – > 14 CY but < 18 CY Dump Trucks – > 18 CY Schedule. The Contactor shall provide and operate the equipment intermittently, as needed by the MaineDOT. The MaineDOT will usually notify the Contractor at least 24 hours prior to scheduled contract work, however circumstances may require a more immediate response. Performance. The MaineDOT reserves the right, at the time of delivery, to inspect the equipment and reject because of condition, and the Contractor shall have the option to replace the equipment with another acceptable, equivalent unit or the MaineDOT may assign the Work to another Contractor. In the case of repetitive breakdowns during operation or if a piece of equipment is unable to run, is unsafe to operate or should not be run as determined by the MaineDOT, the Contractor shall have the option to repair the equipment, begin correcting the defect within 4 hours and complete the repairs in no more than eight (8) hours, unless waived by Maine DOT, or replace the equipment with another acceptable, equivalent unit or the MaineDOT may assign the Work to another Contractor.