Specifications include, but are not limited to: installation of a new 36” gravity sewer main, replacement of 12” storm drain pipe and catch basins, street reconstruction, earthwork, dewatering, pedestrian and vehicular traffic control and associated work as shown on contract drawings and documents; The installation of approximately 210 linear feet (lf) of 12” gravity storm drain and installation of precast catch basins. 2. Construction of Erosion Control Best Management Practices (BMPs) including: silt fencing, inlet protection, dewatering filtration and any other BMPs necessary to comply with the Maine General Construction Permit (MGCP) and environmental permits for in stream work and storm drain outfalls. 3. Installation of approximately 1,250 linear feet of new 36” gravity Trunkline sanitary sewer pipe, sewer manholes, an associated service lateral relocation.