Specifications include, but are not limited to: US 61: FLORIDA BLVD. - GREENWELL ST. MILLING ASPHALT CONCRETE, PAVEMENT PATCHING, ASPHALT CONCRETE OVERLAY, CULVERT REHABILITATION, AND RELATED WORK. 0001 202-01-00100 Removal of Structures and Obstructions LUMP SUM 0002 202-02-06120 Removal of Curbs (Asphalt) 24,544.000 LNFT 0003 202-02-06140 Removal of Curbs (Concrete) 125.000 LNFT 0004 202-02-14500 Removal of Guard Rail 538.000 LNFT 0005 202-02-26300 Removal of Median / Island 196.000 SQYD 0006 202-02-32120 Removal of Pipe (Side Drain) 18" x 42', 18" x 50', 18" x 32' 124.000 LNFT 0007 202-02-32180 Removal of Pipe Headwalls 1.000 EACH 0008 203-05-00100 Excavation and Embankment LUMP SUM 0009 203-10-00100 Cleaning Existing Ditches 355.000 LNFT 0010 501-01-00100 Thin Asphalt Concrete (Dense Mix) 1,863.500 TON