Specifications include, but are not limited to: This is a renovation project. The specifications below will serve as a scope of work. • There are existing plumbing and electrical connections both in-wall and out. • The vendor shall decide how new connections will be made to an existing connection. • A mandatory job site visit will be held to allow prospective bidders to inspect the job site between 9:00 AM and 3:00 PM Monday-Friday. • Measurements and notations shall be made during the site visit in order to provide an informed bid. • Work shall be completed within three (3) months after notice to proceed has been issued. • Vendor shall provide all labor, material, equipment, and insurance. • The following items will be provided by the facility; all other fixtures shall be provided by the Contractor: Sink, Shampoo bowls, Hairdryers, Manicure station, Hairstyling stations, and Pedicure chairs. A. Renovation 1. Vendor shall cut out walls as needed for plumbing for one (1) sink, two (2) shampoo bowls, water heater, two (2) manicure stations, and clothes washer. Cut out walls as needed for plumbing re-routes. 2. Vendor shall run hot and cold-water lines using pex pipe at lengths to be scaled from Attachment D: Drawings. 3. Vendor shall run hot and cold water lines for two (2) shampoo bowls with cut off valve on each line. 4. Vendor shall install one (1) hand washing sink with hot and cold water with cut off valve. 5. Vendor shall provide and install one (1) 40-gallon water heater with pop-off valve and drain pan. 6. Vendor shall run 2” drain with p-trap (plumbing trap) to all fixtures shown in Attachment D: Drawings.