Specifications include, but are not limited to: One (1) day each month, contractor shall clean the secured storage room. The facility square footage: 11576 ft. Daily Cleaning: Lobby, Offices, Kitchen and Hallways 1. All trash receptacles to be emptied and trash removed to a collection point. (liners to be furnished by client)(To be performed twice per day) 2. Vacuum all carpeting in traffic lanes. 3. Clean and polish drinking fountain/water dispenser. 4. Thoroughly dust all horizontal surfaces: files, window sills, chairs, tables, pictures and all manner of furnishing in above named areas. 5. Remove dust from corners, crevices, moldings, and ledges. Dust ledges, sills and flat surfaces to six feet high. (including light switches, face plates, handles and push plates) 6. Dust mop hard surface floors with a non-treated dust mop. 7. Damp mop hard surface floors to remove any spillage or soiled areas. 8. Damp wipe entrance metal and finger marks on entrance glass. 9. Spot clean partition glass. Daily Cleaning: Restrooms(To be performed twice per day) 1. Fill, clean and sanitize dispensers: towels, tissue and hand soap. (to be supplied by client) 2. Empty sanitary napkin receptacles and damp wipe with disinfectant. 3. Empty trash receptacles and wipe if necessary. 4. Clean and polish mirrors.