Specifications include, but are not limited to: A Construction Management at Risk (CMAR) Contractor will construct the Comite River Diversion Bridge at LA 67 (SPN H.001352), as well as the Comite River Diversion Bridge at LA 19 and the Railroad Bridge at LA 19 (SPN H.002273). The first phase of these Projects will be pre-construction services. DOTD will select a consultant to work with DOTD and the CMAR Contractor to develop a design that meets the goals of the Projects and incorporates Value Engineering (VE) and constructability ideas allowing the CMAR Contractor to arrive at a price for the Projects with a minimum of cost-association risk. The consultant must be able to develop a strong, collaborative working relationship with the CMAR Contractor and DOTD.