Specifications include, but are not limited to: Providing all materials, labor, equipment, tools, software and programming necessary to remove existing access door systems, furnish and install six (6) Stanley DuraGlide 2000/3000 access door systems or equivalent, in strict accordance with the following specifications. The new access doors shall be installed to provide replacement of existing access doors on the LSDVI campus. Contractor is responsible for visiting the jobsite prior to bid submission to ensure measurements, electrical data, environment and location requirements. New units must have adequate options to provide for flexibility of installation to existing locations. The six (6) locations are: entry to LSD Elementary School, entry to LSVI School, entry to LSD Middle/High School, entry to Student Health Center, and two (2) entries to the Cafeteria, one for LSD and one for LSVI.