Specifications include, but are not limited to:6” PE Line Extension from Buddy Ellis and Juban Rd. Intersection along Forrest Delatte Rd. to the Entrance of the The Preserve at Gray’s Creek. installation of natural gas distribution pipeline facilities southward along Juban Rd. on the east side of the roadway in the ROW. Once at Forrest Delatte Rd., the 6” PE line will be bored under Juban Rd. and head westward to the entrance of The Preserve at Gray’s Creek along the south side of the roadway in the ROW. The 6” PE gas distribution line will be stubbed out in order for the development to connect and provide natural gas to the proposed subdivision. The project consists of the installation of approximately 3,900 linear feet of 6” PE and approximately 30 linear feet of 4” PE natural gas line. Included are the installation of valves, testing and associated tie-ins and necessary appurtenances.