Specifications include, but are not limited to:i.Contractor shall hydro blast (pressure wash) courts to remove all of the old coating material down to bare concrete. Contractor shall use at a minimum a 5,000 psi pressure washer. Sand blasting will not be allowed. ii.Once the pressure washing and cleanup of the old coating material is completed, the contractor shall prepare the concrete to receive the new coating material. iii.All existing cracks shall be routed out and fill with deep patch materials iv.Contractor shall flood all courts with water and allow water to drain for an hour to detect any low spots (bird baths) in the concrete that may be holding water. After one hour no spot shall be holding water any deeper than 1/4 of an inch in every 10’. The flooding process and subsequent inspection shall be monitored by University personnel. Please schedule this appropriately with University personnel. Pictures shall be taken and submitted for documentation.