Specifications include, but are not limited to: The Contractor should furnish the following: a. All labor to include; but not limited to, complete management, control, transport, purchase, receipt, storage, issue, set up, handling processing, drying towels (paper), and soap for dispensers. b. Garbage cans and liners for the inside and outside shower unit. c. All fuel, electricity and water for the shower. d. Temporary waiting area with chairs and grass rugs sufficient to stage ten personnel. e. A five gallon water bucket with chlorine solution for flip-flops used for showering. The Contractor should ensure the following: a. Certificated Potable water initial supply of 1500 gallons of potable water with recurring certificated potable water reorders using a 6,000-8,000 gallon tanker. b. Gray water storage capacity of a minimum of two 1350 gallon bladder bags per shower. c. Gray water removal. d. Living accommodations and meals for Contractor’s personnel. e. Adequate fire extinguishers meeting current Occupation Safety and Health Act (OSHA), National Fire Protection Association 10. f. Ensure that employees are neat and clean in fact as well as in appearance. All employees should wear identification that distinguishes the Contractor represented.