Specifications include, but are not limited to: Wallace Lift Station is to operate with 3 pumps in alternating sequence, the change of lead pump is determined either by the level being pumped down to the stop level or a constant run time of 8 hours on the current lead pump position. The maximum number of lift pumps running at the same time is 2 pumps. In the event of a pump being faulted or turned to the off position it will automatically be replaced with next pump in line to be called to run. The maximum and minimum pump speeds for each pump speed will be set and adjustable via a password protected page on the station touchscreen. Three wet well level settings will be set and adjustable via the station touchscreen, Stop Level, Maintain Level & Lag Level Setpoints.