Specifications include, but are not limited to: A. Install 850 feet of 6” ADS N-12 pipe and fittings to connect pipe to pipe and pipe to catchbasins. B. Contractor is responsible to dispose of old pipe, catch-basins and excess soil C. Existing catch-basins are to be reused. However if any catch basins are damaged in the process and can‘t be used, they must be replaced with catch basins the same size as the existing ones. D. Removal/replacing of existing sod and pack soils to reduce settling of trench lines in accordance for playability according to USGA rules of golf E. All drain lines installed shall have sufficient changes in elevation to allow the affected areas to drain down any and all standing water F. Contractor needs to provide their own equipment, labor, fuel and housing if needed G. Contractor needs to purchase all materials needed to complete the project including: pipe, fittings, soil and sod H. Contractor is responsible to locate all existing utilities, irrigation pipes, irrigation wires, irrigation heads and drainage lines before digging or trenching I. Contractor is responsible to repair any and all utilities, irrigation pipes, irrigation wires, irrigation heads and drainage lines at their expense that they damage J. Must have at least 3 years of golf course renovation/remodel experience