Specifications include, but are not limited to:. Demolition work shall include removal, remediation and disposal of existing gwb ceiling (w/ trace asbestos in texture & drywall compound) and existing above ceiling loose fill fiberglass insulation.?This work shall be bid as a Unit Cost item on a per living unit type basis (Types of living units include: 1 bedroom living unit, 2 bedroom living unit, 3 bedroom living unit, 4 bedroom living unit).? This work shall be performed by a Louisiana licensed asbestos removal/remediation contractor, and this work shall be done in accordance with all federal, state and local regulations and as per project specification, including all required tracking and support documentation.?? ? Construction work shall include, but is not limited to, new exterior wall and ceiling insulation (including closed cell spray foam insulation @ exterior walls up to 4?-0? above finish floor), new gwb on all interior and exterior walls and ceilings, new (replacement) central HVAC system including ductwork, new VCT flooring, new wood baseboards and shoe mold, new interior and exterior doors and frames and interior door hardware (exterior door hardware shall be salvaged and re-used), including casing trim, new window sill and stool trim, new alum storm doors, new plumbing fixtures , new PE hot and cold water piping, new kitchen base and wall cabinets and countertops, new bathroom vanity base cabinet and countertop, new synthetic marble tub/shower surround & Bathroom wet wall wainscot,?new electrical devices and wiring back to, and including, new electrical panel, new light fixtures, and painting.? Contractor shall provide a base bid price for (1) one bedroom living unit and (1) two bedroom living unit, as defined in the construction documents.?