Specifications include, but are not limited to: This project shall remove a small portion of concrete topping and concrete in a corridor of a fully occupied nursing home. A temporary corridor path shall be provided as shown on drawings to be used during the course of construction. A dust barricade and dust extraction system will be required. Work will be scheduled for least disturbance to occupants and length of disruption. Floor shall be patched with specified material, and new vinyl tile and rubber base shall be applied. Two existing nurses stations shall be removed and replaced with new plastic laminated custom casework and solid surface countertops. There will be minor amount of electrical work required for re-installing existing receptacles in the casework. The extent of concrete replacement is approximately 200 sf. The new nurses stations are generally the same size and location of existing.