Specifications include, but are not limited to: Procurement and installation of structural reinforcements and modification; installation of membrane separation unit; installation of vacuum pump skid; installation of knock out pot/condenser skid; installation of blower; installation of solvent recovery column; installation of solvent recovery column heat exchanger and bottoms pump; installation of filter; modification to existing column, procurement and installation of associated piping systems, installation of instrumentation; installation of control valves and procurement and installation of associated air tubing. Note that these systems connect into the existing CO2 capture system with an additional power feed required from the LG&E power plant system.