Specifications include, but are not limited to: 1. Comply with NFPA 13 for all sprinkler installations. 2. Provide an Inspector's Test Station at the furthest point on each zone. Plumb all test station discharge to building drain system. 3. Automatic reset or self-closing sprinkler heads are prohibited on University projects. 4. All newly installed sprinkler systems must be fully flow tested by the Contractor in the presence of the Consultant’s engineer, University Project Manager and the University Fire Marshall.. 5. Sprinkler systems are to be hydraulically designed. Scheduled design systems may be used for small systems. Clearly state who (the consultant or the contractor) is responsible for the hydraulic design of the sprinkler system. 6. State the fire suppression data, classification and design information on the project drawings.