Specifications include, but are not limited to: he renovations will consists of a new acoustical plaster vaulted ceiling, new and refinished drywall repair on multiple levels, carpet flooring on multiple levels. There is one (1) alternate to update casework and add new vestibule walls on Level 4 (Main Lobby). The existing main systems for the mechanical, electrical, plumbing, and fire protection infrastructure will remain. Construction will be sequenced to expedite the resumption of occupancy. The building will be occupied during the construction duration but the area impacted by the renovation will be unoccupied according to the sequencing of the project. Coordination with the Owner during the renovation will be required.