Specifications include, but are not limited to: renovation to Men's and Women's Restroom/Shower, Locker Room, and security upgrades to Vault. The Restroom/Shower areas will include removal of existing ceramic tile floors to concrete slab, all plumbing fixtures and partitions will be removed, and all light fixtures will be removed. Existing HVAC system will remain and be protected from damage. New C.M.U. partitions will be constructed in both shower areas. All floors and walls in the Restroom/Shower areas will receive new resinous coating (Methyl-Methacrylate type). New light fixtures and receptacles will be installed throughout the Restroom/Shower and Locker Room. New plumbing fixtures will be installed along with new phenolic core restroom partitions. The existing Vault will receive security caging upgrades at the interior, including steel caging panels on the walls and ceiling and 1/4" steel plates on the floor. The Locker Room will receive new lockers on C.M.U. bases, resinous coating on floor and paint on walls. One hollow metal door will be deleted and filled in and one hollow metal door will be added from the Locker Room to the Hall.