Specifications include, but are not limited to: procure and install a new, concrete cover manhole for the existing Fair Street Booster Station, which will be in the middle of a proposed street. The cover will include traffic-rated aluminum hatch covers. The Owner will demolish the existing control building and install the new concrete manhole and covers, prior to the connection of electrical panels to the existing station, under this contract. The Contractor shall coordinate his work with that of the Owner to minimize the down-time of the Booster Station, i.e., the service, panels, etc., should be in place prior to the time the Owner begins to demolish the existing building. As demolition proceeds, the Owner and Contractor will coordinate the work to install conduit from the panels into the station.