Specifications include, but are not limited to: 1. Renovation of the South first-floor pediment, doors, step treads and handrails, and access to walkways. 2. Renovation of the South Basement entrance steps and walkway. 3. Renovation of the West first floor entrance pediment, doors and handrails. 4. Replacement of the door-system on the East Split-level entrance between the basement and first floors 5. Removal of the existing metal canopy on the rear split-level entrance. 6. Renovation of the exterior rear step-system from the split-level entrance to the ground level. 7. Rubble stone veneer application to the rear step support system. 8. Renovation of the HC entrance on the East ground level including the addition of an entrance foyer with new HC exterior door. 9. Lighting fixture change and additions to both East entrances, and 10. Renovation and upgrading of the existing first floor exterior lighting fixtures