Specifications include, but are not limited to: Furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for the construction. The project consists of the creation, expansion and/or resurfacing of six (6) asphalt parking lots across campus. Three of the project sites are expansions of existing lots: The ADA lot at the corner of Rose & Huguelet; the Scott Street lot and the lot behind the Craft Center/Memorial Coliseum, where the outdoor Blue Basketball Courts (and most recently the temporary Bookstore) were located. Two of the sites are currently gravel parking lots at the corner of Elizabeth St and Transcript and on Transcript to the west of Press Ave. The final lot will be constructed at the corner of Press and Leader Avenues. Demolition of existing elements will be required at each site to differing degrees. Erosion control measures shall be installed and maintained at each site throughout the duration of construction. Some earth moving will be required on several of the lots. Concrete curb/gutter will border nearly all sides of the parking lots and concrete sidewalks and driveway aprons will be required at most of the lots. The Scott Street lot includes a concrete stair with stainless steel handrails and campus standard bollards. All of the lots will be paved with asphalt and striped per UK’s standards. Storm sewer improvements will be included at the ADA, Press Avenue, Elizbeth Street and Scott Street lots. Lawns around all lots will be sodded and planting beds installed with hardwood mulch, trees, shrubs and perennials. Lighting improvements will be included at the ADA, Press Avenue, Scott Street and Blue Courts lots. The sites will be phased as follows: Phase 1 will commence May 8 and include the ADA and Elizabeth Street lots; Phase 2 will commence June 4 and include the Blue Courts, Scott Street and Transcript West*. Phase 3 will commence July 9 and will include the Press Avenue lot. All lots except Press Avenue must be substantially completed by August 1*. (*Elizabeth Street must be completed before Transcript West can commence.) Press Avenue must be substantially completed by September 10, 2018.