Specifications include, but are not limited to: Renovation of Elevators No. 1 and No. 2: Removal and replacement of door operator equipment; removal of the existing resilient base, surface preparation, and installation of new resilient base; removal of the existing vinyl flooring, surface preparation, and installation of new textured rubber tile flooring; installation of new stainless steel kick plates over existing laminate elevator cab wall finish; removal of existing and installation of new framed LED ceiling system; installation of new threshold assembly at hoistway pit door; installation of new jamb protection at each elevator entrance on each floor; removal of existing and installation of new hall call push station at each elevator entrance on each floor; removal of existing and installation of new interior elevator car position indicator; and removal of existing and installation of new car control station. Renovation of Elevators No. 3 and No. 4: Removal of the existing resilient base, surface preparation, and installation of new resilient base; and removal of the existing vinyl flooring, surface preparation, and installation of new textured rubber tile flooring.