Specifications include, but are not limited to: The New Research Building #2 consists of a new multidisciplinary research laboratory that will be the cornerstone of the University’s push to become a Top 20 national research facility. This facility is based on the latest improvements in research laboratory design standards, with spaces including a state of the art vivarium, wet lab neighborhoods, computational wing, dining facility, meeting spaces, future fit out expansion floors, as well as interview and imaging suites. The Phase 2 portion of this project, focuses on the fit out of the remaining Basement Vivarium, Levels 4 and 5 wet and dry lab spaces, along with smaller portions of adjustment to floors that have already been fitted out. Trade Contract No. - Description: 01A General Requirements 05A Structural & Misc Steel 06A Millwork & Wood Paneling 08A Doors, Hardware, & Security 08B Interior Glass, Glazing, & Metal Panels 09A Drywall, Ceilings, CFMF, & Wall Panels 09B Painting & Caulking 09C Carpet, Sheet, & Resilient Flooring 09D Ceramic Tile 09E Epoxy Flooring 10A Div. 10 & Accessories 10B Signage 12B Shades 13A Controlled Environmental Rooms 21A Fire Protection 23A Plumbing, Mechanical, Controls, & T&B 26A Electrical & Data 32A Hardscape & Landscape